Microsoft Defender Deployment Checklist

Last updated: 2026-07-27

References

Back to the documentation hub

Use this checklist for each Defender product or workload plan. Record evidence, owner, date, and scope instead of marking an item complete without validation.

Discover and design

Prepare and pilot

  • Assign platform, security operations, finance, privacy, and workload owners.
  • Document required identities, permissions, endpoints, agents, and extensions.
  • Define pilot scope, success criteria, rollback, and maintenance window.
  • Configure the plan settings, alert routing, escalation, ticketing, and evidence retention.
  • Enable the plan for a non-production or low-risk representative scope.
  • Verify inventory, sensor health, recommendations, telemetry, and test alerts.

Expand and enforce

  • Resolve pilot blockers and record accepted limitations.
  • Deploy centrally with policy, infrastructure as code, or approved automation.
  • Reconcile protected inventory against the source of truth.
  • Start enforcement controls in audit or report-only mode.
  • Test incident containment and business recovery before automatic response.
  • Communicate operating procedures to service owners and support teams.

Operate

  • Monitor coverage, connector health, data freshness, exclusions, and drift.
  • Triage recommendations by risk and assign remediation due dates.
  • Review cost, plan changes, release notes, and support matrices regularly.
  • Remove retired assets, stale connectors, permissions, and billable plans.
  • Exercise response playbooks and audit privileged actions.
  • Measure risk reduction and response outcomes, not only alert count.

Operational decisions

  • Treat each completed item as evidence-backed: record the owner, scope, date, verification method, exception, and next review date instead of a bare tick.
  • Gate expansion on measurable pilot success, including inventory coverage, alert delivery, response ownership, recovery testing, and observed cost.
  • Re-run the checklist after architecture, licensing, cloud-region, connector, or operating-model changes, not only during the initial deployment.

Business example

For an AKS pilot, the platform owner supplies two non-production clusters, the SOC owns alert triage, and finance reviews the expected plan charges. Success means every node and registry is visible, a benign test finding reaches the chosen incident queue, and the cluster team can remediate it within the agreed window. Only after those checks and a tested rollback does the organization apply the configuration through policy to production subscriptions.