Microsoft Defender Deployment Checklist¶
Last updated: 2026-07-27
References
Use this checklist for each Defender product or workload plan. Record evidence, owner, date, and scope instead of marking an item complete without validation.
Discover and design¶
- Inventory tenants, subscriptions, cloud accounts, assets, regions, and owners.
- Classify data, business criticality, exposure, and regulatory requirements.
- Select the exact Defender product, plan or tier, and eligible resource types.
- Read the current support matrix, prerequisites, limitations, and pricing.
- Decide management hierarchy, data location, retention, and RBAC design.
- Estimate monthly cost with representative production volume.
Prepare and pilot¶
- Assign platform, security operations, finance, privacy, and workload owners.
- Document required identities, permissions, endpoints, agents, and extensions.
- Define pilot scope, success criteria, rollback, and maintenance window.
- Configure the plan settings, alert routing, escalation, ticketing, and evidence retention.
- Enable the plan for a non-production or low-risk representative scope.
- Verify inventory, sensor health, recommendations, telemetry, and test alerts.
Expand and enforce¶
- Resolve pilot blockers and record accepted limitations.
- Deploy centrally with policy, infrastructure as code, or approved automation.
- Reconcile protected inventory against the source of truth.
- Start enforcement controls in audit or report-only mode.
- Test incident containment and business recovery before automatic response.
- Communicate operating procedures to service owners and support teams.
Operate¶
- Monitor coverage, connector health, data freshness, exclusions, and drift.
- Triage recommendations by risk and assign remediation due dates.
- Review cost, plan changes, release notes, and support matrices regularly.
- Remove retired assets, stale connectors, permissions, and billable plans.
- Exercise response playbooks and audit privileged actions.
- Measure risk reduction and response outcomes, not only alert count.
Operational decisions¶
- Treat each completed item as evidence-backed: record the owner, scope, date, verification method, exception, and next review date instead of a bare tick.
- Gate expansion on measurable pilot success, including inventory coverage, alert delivery, response ownership, recovery testing, and observed cost.
- Re-run the checklist after architecture, licensing, cloud-region, connector, or operating-model changes, not only during the initial deployment.
Business example¶
For an AKS pilot, the platform owner supplies two non-production clusters, the SOC owns alert triage, and finance reviews the expected plan charges. Success means every node and registry is visible, a benign test finding reaches the chosen incident queue, and the cluster team can remediate it within the agreed window. Only after those checks and a tested rollback does the organization apply the configuration through policy to production subscriptions.